From Dream to Move-In Day

Our Process:
Built for You.

We handle every step — from design and permits to foundation, utilities, and the final nail. You'll always know who's working on your home and can trust the quality of every detail.

Simple, Transparent,
Start to Finish.

At Padron Tiny Havens, we believe the process of building your home should be just as good as the home itself. No surprises, no runaround — just honest work, clear timelines, and a team that keeps you in the loop every step of the way.

We offer full-service builds — meaning we can handle everything from permits and foundation prep to utility hookups, so you can focus on the exciting part: moving in.

2–4 Months to delivery from contract signing
8 Clear steps from first call to move-in
100% Family built, personal attention guaranteed
3–6 Months total including setup & permitting

Full-Service Options

We Handle It All —
If You Want Us To.

Every base package includes the full build of your home. The add-ons below are available for clients who want a true turnkey experience — no subcontractors to manage, no guesswork.

Permit Assistance

Starting at $500–$1,500

We handle the paperwork, coordinate with your local city or county, and guide the permitting process from start to finish so you don't have to figure it out yourself.

Foundation Prep

Starting at $3,000–$8,000

We prep and pour your foundation — whether a concrete slab, pier, or block — so your home is placed on a solid, level base built to last. Cost varies by site and foundation type.

Utility Connections

Starting at $2,500–$5,000

We connect your water, electric, and sewer hookups so your home is fully move-in ready the day we finish. No need to coordinate separate contractors for each service.

Step by Step

What to Expect

1
Week 1–2

Inquiry & Consultation

Reach out via our website or give us a call. We'll sit down with you to discuss your needs, budget, and vision. We'll walk you through our models, available add-ons, and answer every question you have — no pressure, no rush.

2
Week 1–4

Design Selection & Customization

Choose from one of our signature models or work with us to customize your layout, finishes, and features. Every design is built around you — not the other way around.

  • Layout adjustments & finish selections
  • Energy-efficient options (solar prep, mini-splits)
  • Code-compliant blueprints by licensed engineers
3
Immediate upon approval

Contract & Deposit

Once you're happy with the design and quote, we sign the contract and collect a deposit (typically 20–30%). This officially kicks off your build and locks in your timeline. Any add-on services are confirmed and priced at this stage.

4
Add-on service

Permit Assistance Optional Add-On

If you've added permit assistance, we get to work on your local permits right away — submitting documentation, coordinating with your city or county, and keeping things moving so there are no delays when your home is ready for delivery.

5
Week 4–8

Build & Quality Inspection

This is where the magic happens. We build your home ourselves — framing, electrical, plumbing, HVAC — with quality inspections throughout. You'll receive updates along the way so you're never left wondering.

  • Full framing, electrical & plumbing
  • HVAC installation
  • Multiple quality checkpoints throughout the build
6
Week 1–2 after build

Delivery to Your Site

Your completed home is transported to your property via flatbed truck. We coordinate the delivery logistics and make sure everything arrives in perfect condition.

  • Delivery timeframe: 2–5 days depending on distance
  • Shipping costs typically $2,000–$5,000
7
Add-on services

Foundation Prep & Utility Connections Optional Add-Ons

If you've added foundation prep, we get your site ready and place your home on a solid, level base. If you've added utility connections, we hook up your water, electric, and sewer so everything is live before we leave.

  • Concrete slab, pier, or block foundation options
  • Water, electric & sewer hookups handled by us
  • No need to coordinate separate contractors
8
Move-in day!

Welcome Home

Add your personal touches and step into your new home. Whether you chose a base build or the full-service experience, you're moving into a home built with care, by a family that takes pride in every nail. Welcome to your tiny haven.

Timeline Overview: From signing your contract to delivery at your site: 2–4 months. With foundation, permitting, and utility hookups included: 3–6 months total to move-in day. We'll keep you updated every step of the way — no surprises, ever.

Ready to Start?

Let's Build Your Dream Home.

Have questions about the process or ready to get started? Reach out and we'll get back to you within one business day.

Get Your Free Quote